September2013

Built on the factory premises of AGA in Mo i Rana, LAUTEC builds an air separator.

The scope of LAUTEC includes the preparation and installation of the piping system, the insulation, painting, scaffolding and the heavy assembly of the individual components.
Particularly challenging are the climatic conditions in Mo I Rana, 70 km from the Arctic Circle.

Also all the logistics of materials and the pipe spools are controlled centrally by Philippsburg.

Commissioning is scheduled for Q2 2014. Client: Linde Engineering Munich.