April2013

LAUTEC wins a contract to build an air separation plant.

LAUTEC builds this system on the factory grounds of Buderus.

This is a new facility. The scope of LAUTEC includes the preparation and installation of the piping system, the insulation, painting, scaffolding and heavy assembly of the individual components.
Commissioning is scheduled for Q3 2013. Client: Linde Engineering Dresden GmbH