References

Workshop

Here you can get a first impression.
Our workshop covers 1200 m2. The equipments (including the overhead crane) make the professional pipe prefabrication possible. This workshop is the manufacturing site for carbon steel.
Another workshop is the manufacturing site for stainless steel.

Warehouse

Our warehouse personnel also manages the machines and tools meticulously even on the construction sites.
Assembly personnel works here continuously to do the necessary work.

Permalink

Ticona Frankfurt

Ticona Frankfurt

Ticona, a company of Celanese, one of the world’s leading manufacturer of engineering plastics. The project name “TiGer” stands for the relocation of an entire chemical plant that was required for expansion of the Frankfurt Airport. LAUTEC was commissioned with the entire assembly of the air handling equipment.

Permalink

Brine system Wingas Jemgum

Brine system Wingas Jemgum

One of the largest natural gas storage cavern is located in Jemgum, Germany. LAUTEC received the contract for a brine piping system. The final section of the brine system is in the final stages and must be completed by the end of 2011.
Here the pipe pressures can reach up to 397 bar. Special features of this project are the high numbers of
Radiographic examinatiosn as well as the weights of the individual pipe spools.

Permalink

PP6 Burghausen

PP6 Burghausen

Mechanical assembly and prefabrication of the polypropylene plant PP6 at the factory Borealis in Burghausen.

Linde Basel

LAUTEC built an air separator on the premises of PanGas in Muttenz (Switzerland). This contract was a new installation. The plant produces more than 500 tons of liquefied gas such as nitrogen, oxygen and argon per day. The scope for LAUTEC included the prefabrication and installation of the piping system, the insulation, painting, scaffolding and the equipment installation.

Permalink

Coal powder plant Schaefer Kalk Steeden

Coal powder plant Schaefer Kalk Steeden

This job is the construction of new plants. The scope of services includes the pipe prefabrication and assembly. Special features of this project are the radius elbows used in the piping system. The elbows are coated in a special compound for increased wear protection.

Permalink

Badische Stahlwerke Kehl

Badische Stahlwerke Kehl

The rolling mill 2 which is being expanded and rebuilt by the Badische Stahlwerke.

The scope for LAUTEC covered the entire planning, including the static calculations, assembly and complete supply of the material.

hihi